Definitions
In plain terms
It begins from the declared momentum seed and supplies the input to the second signed smoothing stage.
Technical
The contract freezes long period, alpha, first-change seed, missing values, ordering, precision, and readiness.
Scope
It is not the final TSI numerator.
Examples
- A governed lesson calculates or identifies First EMA of Momentum only after its inputs, window, state, scale, and edge cases are declared.
Common misconceptions
- It is not the final TSI numerator.
Concept relationships
Prerequisites
Required by
Where this concept is used
Tutorials planned
These catalogued topics use this concept, but their complete build has not shipped yet.
- D07-F03-A07 Important
Evidence and governance
- True Strength Index TA-Lib · first party technical publication
Supports: preferred label, short definition, technical definition
Limits: Long/short ordering, EMA seeds, warm-up suppression, optional signal line, and zero denominator vary by implementation.
- Reviewed by
- fintech-builder-batch-008
- Last reviewed
- 2026-07-29
- Next review
- 2027-07-29
- Record status
- published
