D21-F01-A04 · four-stage decision lab · synthetic teaching data
Point-in-Time PD
Build a log-odds PIT bridge that exposes borrower and macro shifts separately while making clear that IFRS 9 and regulatory implementations require much more than this teaching formula.
Question: How can a long-run anchor, borrower information, and a current macro state be combined into a transparent scenario-sensitive PD?
Stage 1 · orient
Choose the analytical question before touching the number
Decision boundary
Invariant:
Stage 2 · predict
Commit to a direction before revealing the challenge
Stage 3 · experiment
Move one declared driver; keep the scenario contract fixed
Complete 61-state output series and evidence trace
Stage 4 · explain
Compare the anchor and candidate before interpreting
Anchor result
Candidate result
| Component | Anchor | Candidate | What changed? |
|---|
Misconception check:
Inspect the structured input and output
Input
Output
Scenario evidence index
The lab surfaces curated stops for instruction while preserving all seven scenarios × 61 independently calculated states for audit.
| Scenario | Driver | Question | Range | Decision segments |
|---|